Public Input Sought for WIS 69 Project, Monroe to New Glarus
July 1, 2021
The Wisconsin Department of Transportation (WisDOT) is seeking input on proposed improvements to WIS 69 from Bushnell Creek near Monroe to Cow Path Lane in New Glarus, in Green County. The improvement project is currently scheduled for 2026, but advanceable to 2023 if funding becomes available.
The pavement on this section of WIS 69 is deteriorating with extensive cracking. The proposed improvements include the following: Remove 2-inches of the existing asphalt surface and pave 2-inches of new asphaltic material; Install centerline and shoulder rumble strips; Add new pavement markings; a...
For access to this article please
sign in or
subscribe.